Wednesday, 13 June 2007

Smart Or Stump? That Is The Question. -Johnz-

In wake of the earlier mentioned flood that took place on my previous entry, coupled with a little free time during my lunch break- yours truly decided to make a quick blog entry before he purges out the rest of his day.

The current topic: The SMART Tunnel.

The "Stormwater Management and Road Tunnel" or "SMART Tunnel", E 38 is a storm drainage and road structure in Kuala Lumpur, Malaysia, a major national project in the country. It is the longest stormwater tunnel in South East Asia and second longest in Asia.

The main objective of this tunnel is to solve the problem of flash floods in Kuala Lumpur and also to reduce traffic jams along Jalan Sungai Besi and Lok Yew flyover at Pudu during rush hour. There are two components of this tunnel, the stormwater tunnel and motorway tunnel.

It begins at Kampung Berembang lake near Klang River at Ampang and ends at Taman Desa lake near Kerayong River at Salak South. The project is led by the government, including Malaysian Highway Authority (LLM) and the Department of Irrigation and Drainage Malaysia (Jabatan Pengairan dan Saliran = JPS) and also a company joint venture pact between Gamuda Berhad and Malaysian Mining Corporation Berhad (MMC).

Approximate Cost (to date)
RM 1.94 Billion


How the SMART Tunnel Works
First mode (No storms)
The first mode, under normal condition where there is no storm or low rainfall, no flood water will be diverted into the system.Under the second mode, SMART system will be activated and this happens when there is moderate storm.

Second mode (Most storms)
When the second mode is activated, flood water is diverted into the bypass tunnel in the lower channel of the motorway tunnel and it is important to note, that, up to this stage, the motorway section is still open to traffic.

Third mode (Major storms)
At the third mode of operation the motorway will be closed to traffic. With extensive and effective monitoring stations, when the third mode of operation is needed, the motorway will be closed to traffic. Sufficient time will be allocated to allow the last vehicle to exit the motorway before the automated water-tight gates are opened to allow flood water to pass through. The motorway will be reopened to traffic within 48 hours after the closure.

Of course, with all these super fantastic features employing cutting edge technology, let us not forget the usual superlative that enhances the glamour (or superiority, take your pick) of front page-worthy news.

It is the longest tunnel in South-East Asia, and the second-longest (we'll make do) tunnel in the whole of Asia.

Punchline
Flooded on Sunday, 10th June 2007.

IN YOUR FACE.

1 comment:

Anonymous said...

Hahhahahahahahahhahahahahahhahahah. Sarcasm at its toppest and finest state. Good one nonetheless.